A browser puts only the first frame of an image on the clipboard, with HTML that names the image address. - Documents and cards download the original of a GIF, WebP, or AVIF address. The host commands workspace_save_image_url and workspace_download_image read the format from the file contents and refuse other data. A failed download keeps the first frame and shows a message. - Copy image in the RuneStone browser keeps the bytes that the page loaded. The engine reads them through the DevTools Protocol, so the website gets no second request. The new copiedImage command gives them in parts below the line limit of the host. A paste uses them first. - An empty dropped image file shows a message. Firefox gives such a file when the website refuses its download. Copy image needs a new browser engine build. Card 0d5c18f7.
9.9 KiB
Project Management guide
This guide explains how to plan work with boards, lists, and cards in RuneStone. It also explains the timeline and calendar views of the same cards.
Project Management is part of RuneStone and is on by default. To turn it off, see Turn Project Management off.
Open Project Management
Select Project Management (the board icon) in the left ribbon. It opens the default board of the workspace, or All tasks when the workspace has no default board. See Choose the default board.
Each board opens in its own tab. To open another board in the same tab, select the board name in the toolbar. Then select a board or All tasks.
A workspace without boards shows Create your first board. Select it and enter a name.
Boards and lists
A board holds lists, and a list holds cards. A new board starts with the lists To do, In progress, and Done.
| Action | How |
|---|---|
| Create a board | More actions (the three dots) → New board |
| Rename a board | Rename board beside the board name, or More actions → Rename board |
| Archive or restore a board | More actions → Archive board or Restore board |
| Delete a board | More actions → Delete board. The cards stay in All tasks. You cannot undo this action. |
| Add a list | Add a list in the toolbar of a board |
| Rename a list, or set its status | List actions (the button in the list header) → Edit list |
| Move a list | Drag its header, or use Move left and Move right in the list actions |
| Set a card limit | List actions → Set list limit. A warning shows at the limit. Cards can still go into the list. |
| Archive all cards of a list | List actions → Archive all cards |
| Delete a list | List actions → Delete list. Its cards go to Unlisted. Their status does not change. |
| Collapse or expand a list | The collapse button in the list header. A collapsed list is a narrow strip with its name and card count. |
Status when a card enters this list sets the status of each card that you move into the list. Choose Do not change status to keep the status of the card.
Cards
| Action | How |
|---|---|
| Create a card | Add a card at the bottom of a list, or More actions → New card |
| Open the card details | Select the card |
| Move a card on the board | Drag the card, or use Move to list, Move up, and Move down in the card actions |
| Put a card on another board | Card actions → Move to board |
| Take a card off this board | Card actions → Remove from board. The card stays in All tasks and on its other boards. |
| Archive or restore a card | Card actions → Archive or Restore. More actions → Show archived shows the archived cards. |
| Delete a card | Card actions → Delete card. It removes the card from all boards. You cannot undo this action. |
| Work with more than one card | Select cards in the toolbar. Then move the selected cards to a list or a board, or delete them. |
| Find a card | Search tasks in the toolbar. The search looks in titles, descriptions, tags, labels, assignments, and custom fields. |
A card can be on more than one board, with a different list on each board.
The card details have the title, the labels, and the description in Markdown. A change to the description stays a draft until you select Save. Cancel restores the saved text. When you close the card with a draft, the card shows an unsaved marker. Board and list changes save at once. Other fields save when you close the card details.
Card details
Select Add details in the card details to add one of these fields:
| Field | Use |
|---|---|
| Priority | The urgency of the card, apart from its labels |
| Labels | Colored labels that all boards of the workspace share |
| Tags | Plain words for the search |
| Planned dates | The first and the last day of the work. The Gantt view shows them as a bar. |
| Deadline | The due date. Gantt and Calendar show it with ◆. |
| Work session | A start time and an end time. The Calendar view shows the session. |
| Assignments | People, teams, or customers |
| Color | The color of the card |
| Custom field | A name and a value of your choice |
| Subtasks and linked cards | Smaller tasks of the card, and other cards that block it, that it blocks, or that relate to it |
| Card cover | An image of the card that shows on the board |
More actions → Add existing note makes a new card from a Markdown note of the workspace. The card gets the file name as its title and the note text as its description. The note does not change. Later edits to the note do not change the card.
Labels and priority
Select Manage labels (the tag icon) in the toolbar to add, rename, recolor, or delete labels. All boards of the workspace share the labels. A change of name or color applies to each card with the label. When you delete a label, RuneStone removes it from all cards.
Priority has two, three, or five levels. To change the number of levels, see Change the Project Management settings.
Views
The buttons at the left of the toolbar change the view of the board.
| View | Shows |
|---|---|
| Kanban | The lists and their cards |
| Gantt | Each card with its planned dates as a bar and its deadline as ◆, for 28 days from the visible date |
| Calendar | Deadlines and work sessions by Day, Week, or Month, in the time zone of your computer |
Previous, Today, Next, and the date field change the visible dates of Gantt and Calendar.
In Calendar, you can create a card from a date:
- In Month, select the number of a day to create a card with that deadline.
- In Day or Week, select an hour to create a card with a one-hour work session.
Gantt and Calendar do not move a card when you drag it. To change dates, open the card and edit Planned dates, Deadline, or Work session.
All tasks
All tasks shows the cards of all boards of the workspace in one view.
- Lists with the same name on different boards share one column. The match ignores uppercase and lowercase letters.
- In each column, the cards show below the name of their board. Cards without an active board show below No active board.
- You cannot drag cards between columns. To move a card, open it and change Board or List, or open its board.
- A new card in All tasks needs a board. Choose the board and the list in the card details.
Images
To add an image to a card, paste it or drop it into the description, or select Add image. Use a PNG, JPEG, GIF, or WebP image of at most 50 MiB. To show an image on the board, add Card cover and choose one of the images of the card.
A web browser copies only the first frame of an image. When you paste a GIF or WebP image from a browser, RuneStone downloads the original file. Then the animation stays.
Some websites refuse that download. Then the card gets the first frame, and RuneStone shows a message. To keep the animation, use Copy image in the RuneStone browser. That copy keeps the original file that the page loaded.
More actions → Customize background sets an image behind the open board, or behind All tasks. To show the Background slideshow on the boards, see Choose where the background shows.
Choose the default board
- Open Settings → Project Management, or select More actions → Project Management settings.
- Select Default board.
- Select a board, or All tasks.
Each workspace has its own default board. The ribbon button then opens that board. Restored tabs keep their board. An archived or deleted default board opens All tasks.
Change the Project Management settings
Open Settings → Project Management. The page shows only while Project Management is on. Each change saves at once.
| Setting | Values |
|---|---|
| Priority levels | 2 (High and Low), 3 (High, Medium, and Low), or 5 (Highest through Lowest). The default is 3. The priorities of existing cards do not change. |
| Default board | All tasks or one board of the current workspace. See Choose the default board. |
After an update, the first start copies the priority levels of the old Project Management plugin.
Where the boards are
The boards, cards, labels, and images of a workspace are in .runestone/pm/ in the workspace folder.
To see this folder in the file tree, turn on Show .runestone folder in Settings → General.
Git ignores .runestone/pm/, because RuneStone puts a .gitignore file there. To keep a copy of your boards, back up this folder separately.
Move old Project Management notes
Early versions of the Project Management plugin kept boards and cards in visible Markdown notes, and labels in runestone-pm-labels.json.
RuneStone reads only .runestone/pm/. When a workspace has data in the old format, Project Management shows Migrate Project Management data.
- Read the list of boards, task notes, and label files.
- If the offer names notes with invalid properties, repair these notes first.
- Select Migrate. RuneStone copies the data to
.runestone/pm/and keeps exact backups in.runestone/pm/backups/. - Examine the boards.
- Remove the original files that Migration complete lists, then select Done.
The migration does not change or remove the original files. Not now hides the offer in this tab.
Turn Project Management off
- Open Settings → Features.
- Clear Project Management.
Off closes the Project Management tabs and removes the ribbon button and the settings page in all windows.
Your boards stay in .runestone/pm/, and your settings stay. Turn Project Management on again in the same place.