# Kanban work, October 8, 2026
## Scope and inspection
Workspace: `D:/Users/KnottyWyvern/Documents/RuneStone`.
The RuneStone board contains six selected To do cards. The Project Management board contains eight.
All 14 selected cards are unblocked.
Selection uses each board placement, not the shared card status.
Command from the RuneStone checkout: `node ../RuneStone_ProjectManagement/.agents/skills/runestone-project-management/scripts/inspect.mjs boards --workspace .`.
The first helper run failed because the renamed plugin checkout lacked usable dependencies (`ERR_MODULE_NOT_FOUND: yaml`).
The documented frozen-lockfile install restored dependencies.
The recent sandbox workspace contained no boards. The RuneStone workspace contained both requested boards.
The helper then retrieved both boards and all 14 cards with exit code 0 and no data issues.
Manual card retrieval was not necessary. The initial dependency failure remains part of this test record.
The shell sandbox also failed before command execution. Authorized commands ran outside that broken sandbox.
## Assignments
Related cards share an agent when their behavior or files overlap. These cards describe distinct outcomes, not confirmed duplicates.
Keep each card and its acceptance criteria. Do not delete or archive cards solely to group implementation.
The coordinator owns board updates, the skill, this record, and integration checks.
| Group | Card IDs | Model and effort | File ownership and sequence |
| --- | --- | --- | --- |
| Tabs and ribbon | bee9f324, c8321a48, d0850861 | Astra 6 high | Workbench, tab/pane layout, related smoke tests |
| Settings density | d8c20c7d, 2a509815 | Sol 6.1 medium | Settings windows, plugin list, dedicated tests |
| Repeated paste | 68136a13 | Sol 6.1 medium | LiveWriter, clipboard lifecycle, paste regression |
| Card details | 32f33744, 30a4c620, ed978e3d, 57074b19 | Astra 6 high | PM detail/editor UI and styles, before other PM groups |
| Card transfer | 7e41dc9e | Astra 6 high | PM board/store/UI, after card details |
| Board controls | 6369fc91, fe7e86e4 | Luna 6 max | PM board title/menu, after transfer releases UI ownership |
| Image viewer | 68fd3750 | Sol 6.1 medium | PM image viewer, description preview, styles, and image tests |
Only one agent edits each file at a time. Separate functions do not imply separate ownership.
Agents preserve all existing uncommitted changes. They do not reset files or commit unrelated work.
The coordinator moves cards to Review after their relevant checks pass. Done requires user acceptance.
The initial implementation scope did not include distributable builds or version changes.
## Skill checks
The six board-helper tests pass, including multiple workspaces, placements, migration conflicts, and read-only behavior.
The revised skill passes the prose lint at 0.97 issues per 100 words.
The Python format validator first failed because PyYAML was absent. It passed after a temporary dependency install.
## Host review results
All six RuneStone cards moved to Review.
The tab bar uses the available width and keeps its new-tab button beside the tabs.
Closing the last tab leaves one New tab. The two misleading ribbon launchers are removed.
Settings and the main window share their header height. Plugin rows use shared spacing tokens.
The paste fix accepts clipboard line endings and stops synchronous edits from returning to their source editor.
Checks pass: host type checks with zero errors or warnings, and all 191 unit tests.
Browser checks pass for tab order, plugin access, menu consistency, saved layout, settings density, settings titlebar, and settings windows.
Paste checks pass for 12 repeated clipboard cycles, saved source, editor reopen, line-ending variants, undo, and 5,000 formatted sections.
Visual checks cover light and dark themes, an 880-pixel tab bar, and settings widths down to 360 pixels.
Native desktop window calls used browser mocks. Native titlebar behavior still needs user acceptance.
## Project Management review results
The four card-detail cards moved to Review.
Description editing stays inside the card. Saved Markdown opens formatted.
Detail hints sit inside buttons. Priority choices use colored icons in a picker beside the trigger.
Type checks, unit tests, and 11 focused browser tests pass for these changes.
## Source review result, before packaging
All 14 selected cards are in Review. The helper confirmed their exact board placements after the updates.
No cards moved to Done. No cards were deleted or archived.
Seven subagents handled the seven groups with one writer for each file.
The small board-control group used Luna 6 max after source review confirmed its limited scope.
The other assignments used Astra 6 high or Sol 6.1 medium as shown above.
Card transfer now preserves the card identity, body, metadata, and unrelated board placements.
The image viewer opens from saved descriptions and supports outside-click dismissal, Escape, focus restoration, and image overlays.
Board menu actions now have icons. The smaller title pencil appears on hover or keyboard focus.
Final checks:
- RuneStone type checks: zero errors and warnings. All 191 unit tests pass.
- Host browser checks include installation, removal, menus, tabs, layout, settings, paste, and undo.
- Project Management type checks and compilation pass. All 101 unit tests and all 103 browser tests pass.
- The six skill-helper tests and the skill format validator pass.
- Both repository patches pass the whitespace check.
The first complete PM browser run exposed seven outdated or brittle test expectations.
Corrections scope deadline inputs to their field region, expect the saved description preview, and establish keyboard focus before checking its indicator.
The next complete run passed all 103 tests. The host install smoke also needed its removed ribbon selector replaced with the command API.
These test corrections retain the existing behavior checks.
Compiled PM output supports bundled-plugin tests. No installer or release ZIP was produced during source review.
Source review used RuneStone `0.1.12` and Project Management `0.2.17`.
The automated browser checks use mocked host calls. Native desktop behavior still needs user acceptance.
Test output is saved under the plugin repository's ignored `.audit/kanban-review-2026-10-08/` directory.
Original card backups are in `.runestone/agent-work-2026-10-08/backups/` in the RuneStone workspace.
Prose lint for this record: 1.45 issues per 100 words.
## Test builds requested after source review
The user requested distributable builds for desktop testing.
RuneStone 0.1.13 is available as `src-tauri/target/release/bundle/nsis/RuneStone_0.1.13_x64-setup.exe`.
Project Management 0.2.18 is available as `../RuneStone_ProjectManagement/plugin-packages/runestone.pm-0.2.18.zip`.
The 0.1.13 installation notes are no longer in the repository.
Both builds completed and passed artifact integrity checks. Previous release files remain intact.
The installer includes the existing browser runtime. Its application version is 0.1.13 and downgrades remain disabled.
The plugin ZIP has its manifest at the archive root. Its recorded file hashes match its contents.
Post-package checks passed the PM type check, 101 unit tests, and 103 browser tests.
Native host tests passed 63 tests, with three ignored.
The 14 cards remain in Review for user acceptance.